Laredo, Texas · 2026 Election

Infrastructure · Election guide

Water and infrastructure

A verified guide to the reliability of Laredo's water system, pipe replacement, funding, alternative sources, and candidates' documented positions.

Laredo water infrastructureagua Laredo 2026Laredo boil water notices

Facts verified as of September 9, 2026

Why it matters

The impact on your daily life

01

Safe, reliable water affects public health, schools, hospitals, restaurants, housing, and the city's ability to attract businesses.

02

The municipal 2024 water-quality report states that Laredo's two treatment plants pump surface water from the Rio Grande, concentrating supply in one primary source.

03

Replacement, treatment, transmission, storage, and new-source projects can affect rates, debt, and the city's growth timeline.

04

Voters should distinguish among completed work, authorized projects, proposed budgets, and announcements that still lack a complete public cost or timeline.

Current situation

What we know

The 2024 Consumer Confidence Report documented a maximum contaminant level violation for E. coli during October 2024. The city issued a citywide boil-water notice on October 10 of that year.

A notice required by the Texas Commission on Environmental Quality also documented incomplete filter-turbidity monitoring at the El Pico plant during a control-system failure between August and September 2024. The city reported repairs and training as corrective measures.

In May 2026, the city issued a precautionary notice limited to the area served by the Jefferson plant. The notice was lifted after more than 50 follow-up bacteriological samples tested negative.

The capital plan includes pipe replacement, transmission lines, an El Pico–Jefferson connection, tank rehabilitation, meters, a quality laboratory, and wastewater work.

In August 2026, the city announced agreements for access to as much as 90 million gallons per day from secondary sources if needed. Final pricing, treatment, delivery infrastructure, and timing remain important public questions.

Key facts

The numbers behind the debate

Reported water loss

13.59%

System-loss audit estimate included in the municipal 2024 water-quality report.

FY 2024–28 capital program

$100.9 million

$59.558 million for water and $41.351 million for wastewater in the adopted plan; a capital plan is not the same as completed work.

FY 2026–27 proposal

$119.2 million

Proposed spending on water and wastewater projects; it should not be presented as investment already completed.

Reported active portfolio

$245.1 million

29 active projects according to a Utilities Department presentation reported in August 2026; it is not an external audit.

Modeled funding gap

$46.6 million

Estimated need after available funds for the FY 2026–27 program; external applications are not awards.

Announced secondary sources

Up to 90 MGD

40 million gallons per day from Jasper Ranch and 50 million from Legacy Water; this is announced access, not production currently being delivered.

Civic analysis

The strengths. The concerns.

The strengths

  • The city has identified and authorized a broad portfolio of line renewal, pump stations, tanks, treatment, and wastewater work.
  • The May 2026 precautionary notice was lifted with state approval after more than 50 negative follow-up samples.
  • The planned connection between El Pico and Jefferson is intended to add redundancy when part of the system is under maintenance or experiencing problems.
  • The secondary-source agreements represent a step toward supply diversification, although they still require public implementation details.
  • The internal classification of projects at risk improved between March and July 2026, according to the Utilities Department report.

The concerns

  • The 2024 E. coli violation, the citywide boil-water notice, and the 2026 precautionary event show that reliability and public trust remain incompletely resolved.
  • The estimated 13.59% loss and continuing pipe replacement reveal a costly, long-term obligation.
  • The state notice about incomplete monitoring documented a compliance failure distinct from final water quality.
  • The FY 2026–27 plan showed a modeled $46.6 million gap and depended on external applications that should not be counted as secured funds.
  • The new-source agreements do not yet publish all costs, treatment requirements, construction obligations, or rate effects.

Did this guide help?

One vote per device. You can change it.

Demand answers

Questions for every candidate

  1. 01What targets will the city publish for breaks, low pressure, boil-water notices, system loss, and restoration time?
  2. 02Which projects are formally funded, and which remain proposed?
  3. 03How will the $46.6 million gap be covered, and what effect would each option have on residential and commercial rates?
  4. 04What are the prices, firm volumes, treatment requirements, and timelines for Jasper Ranch and Legacy Water?
  5. 05What independent technical review supports the sustainable yield of the secondary sources?
  6. 06What milestones and dates govern the El Pico–Jefferson connection, pipe replacement, tanks, and wastewater infrastructure?
  7. 07How will existing water be prioritized for residents versus new high-consumption developments?

The candidates

Documented positions

01

Victor D. Treviño

In his reelection announcement, he cited approximately $119 million in water investment and progress toward a secondary source. This is a campaign claim, and the work remains underway.

02

JD Gonzalez

His platform calls for reliable water systems, capacity for growth, and long-term capital planning. It does not publish a detailed project list, costs, or rate proposal.

03

Jorge A. Garza

No documented position on water infrastructure was found in the official sources, located campaign materials, or local coverage reviewed.

04

Poncho Casso

He has identified water security as a central issue, but the detailed three-point plan was not published in the sources reviewed.

05

Alyssa Cigarroa

Her campaign proposes reducing boil-water notices, repairing aging lines, decreasing leaks, and securing multiple affordable long-term sources. These are campaign commitments, not implemented outcomes.

Sources and verification

Read the original documents

  1. 012024 Consumer Confidence ReportCity of Laredo Utilities
  2. 02Mandatory Notice: Surface Water MonitoringCity of Laredo Utilities / TCEQ
  3. 03Citywide Water Boil Notice Local DisasterCity of Laredo
  4. 04Jefferson Boil Water Notice LiftedCity of Laredo
  5. 05Adopted FY 2024–2028 Capital Improvement PlanCity of Laredo
  6. 06Capital Improvement ProgramCity of Laredo Engineering
  7. 07Laredo plans $119M in water, wastewater projectsLaredo Morning Times
  8. 08Region M Planning GroupTexas Water Development Board
  9. 09Water & Sewer RatesCity of Laredo Utilities
  10. 10Lead Water Service Line InventoryCity of Laredo Utilities